Opportunity #1 - Urban Forest Ecosystem Restoration

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

UPDATES WILL BE POSTED AS IMPLEMENTATION MOVES FORWARD

Opportunity #2 - Green Streets Tree Planting Strategies

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

UPDATES WILL BE POSTED AS IMPLEMENTATION MOVES FORWARD

Opportunity #3 - Western Ave. Median Tree Planting

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

PROJECT HAS BEEN COMPLETED

Opportunity #4 - Harbor Blvd. Medians Beautification

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

PROJECT IS IN DESIGN PHASE

Opportunity #5 - Sampson Way Realignment

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

PROJECT IS CURRENTLY UNDER CONSTRUCTION

Opportunity #6 - N. Gaffey Parkway Phase II

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

CONSTRUCTION DOCUMENTS ARE COMPLETE

CONSTRUCTION EXPECTED TO START IN 2018

Opportunity #7 - Front Street Beautification

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

CONSTRUCTION DOCUMENTS ARE COMPLETE

CONSTRUCTION EXPECTED TO START IN 2018

Opportunity #8 - Private Property Tree Adoption

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

THIS IS AN ONGOING OPPORTUNITY FOR SAN PEDRO PROPERTY OWNERS TO GET FREE SHADE TREES THROUGH CITY OF LOS ANGELES "CITY PLANTS PROGRAM"

Opportunity #9 - Residential Turf Replacement

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

THIS IS AN ONGOING LOS ANGELES DEPT. OF WATER AND POWER PROGRAM FOR RESIDENTS TO REPLACE TURF WITH A DROUGHT TOLERANT LANDSCAPE

Opportunity #10 - Gaffey Great Street

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

IMPROVEMENTS HAVE BEGUN. PHASE I INCLUDED NEW MEDIAN LANDSCAPE PLANTING AND LIGHTING FROM END OF THE HARBOR FREEWAY TO SANTA CRUZ ALONG WITH DISTINCTIVE SIGNAGE

Opportunity #11 - I 110 Harbor Approach Beautification

Project would provide environmental enhancement and beautification within open space areas along Interstate 110 between the W. Channel St. off-ramp and Harbor Blvd. terminus.

SEE FULL DESCRIPTION OF OPPORTUNITY IN DOWNLOAD

UPDATES WILL POSTED AS IMPLEMENTATION MOVES FORWARD

Opportunity #12-N. Pacific to John S. Gibson Bike Connection

Project would create bicycle lanes and green enhancements between O’Farrell at the terminus of the existing bike lanes along N. Pacific to the beginning of the John S. Gibson Scenic Highway at Channel.

SEE DOWNLOAD FOR COMPLETE OPPORTUNITY DESCRIPTION

UPDATES WILL BE POSTED AS IMPLEMENTATION MOVES FORWARD

Opportunity #13 - John S. Gibson Parkway Enhancement

Project would provide green enhancements along the existing John S. Gibson Scenic Highway between Channel and Harry Bridges.

Opportunity #14 - Bandini Cyn. Park to Peck Park Greenway

Project would provide pedestrian safety and green enhancements between the Peck Park entrance on Elberon, along Bandini St. to Bandini Cyn. Trail, and through to Summerland Pl. and the Caltrans Triangle (See Opportunity #1). This Greenway will include bicycle route, lanes and pathway improvements that will ultimately connect to the existing northbound bike lane on N. Gaffey St. at Summerland and to a to be created bike route through Black Hill to N. Pacific (Opportunity 16).

Opportunity #15-Peck Park to Leland Park Pedestrian Pathways

Project would provide enhanced pedestrian pathways that connect Peck Park to Leland Park West and Leland Park East.

Opportunity #16-Summerland to Gaffey & Pacific Bike Connect

Project would close the bike lane/route gap along Summerland between Cabrillo St. and N. Gaffey and on to N. Pacific through the Black Hill Neighborhood.

Opportunity #17-Leland Park Slopes Environmental Enhancement

Project would provide environmental enhancement along the slopes of Leland Park West and Leland Park East.

Opportunity #18-N. Gaffey Ped. Path-Elberon to Miraflores

Project would construct a safe pedestrian path/sidewalk along the west side of N. Gaffey between the existing sidewalk that ends under the Elberon Bridge to Miraflores with spur connections into the existing Leland Park West terraces.

Opportunity #19-N. Gaffey-Summerland Landscape Medians

Project would create a raised landscape median along N. Gaffey between Summerland and Channel where a median lane currently exists, close a sidewalk gap on the east side of N. Gaffey between Summerland and the Elberon Bridge, enhance the existing slope along the same segment, landscape existing medians along Summerland east of N. Gaffey, and provide bus stop enhancement at the Summerland/N. Gaffey intersection.

Opportunity #20-N. Gaffey Parkway Ph. III-Channel to Anaheim

Project would create raised landscape medians, install parkway enhancements, and construct missing sections of curb, gutter, and sidewalk along N. Gaffey between Channel and Anaheim Streets, thereby completing a continuous “green pathway” between Downtown San Pedro and Machado Lake (Harbor Regional Park).